Question No: 21

Material Requirement Planning will .

  1. Determine gross demand, subtract what Is on hand, and calculate net requirements

  2. Use information from the Bill of Material and inventor/ records to calculate the time-

    materials requirements.

  3. Not review or change the messages once they are generated

  4. Use only single-level planning to focus on the end item

  5. Develop messages only for the purchase of end item

Answer: D

Question No: 22

Which three are abilities of the Plant Manager Dashboard?

  1. Define goal values for relevant metrics

  2. Review timely metric data

  3. Display employees performance

  4. Display relevant metrics at different levels

  5. Define setup for implementation

Answer: B,D,E

Question No: 23

Which three statements about Hours and Quantities Entry are true?

  1. Scrap reported in Hours and Quantity Entry will generate an IS General Ledger transaction

  2. A manual or batch update must be done for the correct General Ledger transactions.

  3. If the user enters both hours and quantities on a single line and re-inquires, the line will display split.

  4. Employee labor rates can be secured.

  5. Completions reported in hours and Quantity Entry will generate an IC General Ledger transaction.

Answer: B,D,E

Question No: 24

The customer wants to implement Actual Costing. What should they be aware of on the manufacturing-side?

  1. They need to use engineer-to-order or make-to-order practices and oversee the entry of all information on the work orders.

  2. They need to use process manufacturing.

  3. They need to use engineer-to-order or make-to-stock practices and oversee the entry of alt information on the work orders

  4. They need to use discrete manufacturing.

Answer: D

Question No: 25

Which statements are about available to promise?

  1. Only actual customer orders, such as Sales orders, are used to determine ATP

  2. ATP uses demand for forecast only

  3. ATP indicates the number of Items sold

  4. Actual customer orders and forecast are used as demand to determine ATP

  5. Cumulative Available to Promise (CATP) is running total of ATP

Answer: C,D

Question No: 26

What is the Manufacturing Accounting System used for? (select 3)

  1. Create Journal Entries for Work Orders

  2. Create Journal Entries for Rate Schedules

  3. Create Variance Journal Entries

  4. Create Recurring Journal Entries

  5. Create Routings and Work Orders

Answer: A,B,C

Question No: 27

Which are created as a result of running the UBE MRP-MPS Requirements Planning (R3482)?

  1. Action Messages

  2. Warning Messages

  3. Work Orders

  4. Purchase Order

  5. Time Series

Answer: C

Question No: 28

The Cost Simu-lation program (R30S12) adjusts direct labor hours and direct machine hours by:

  1. Time Basis

  2. Move Hours

  3. Crew Size

  4. Pay Point Code

  5. Cumulative Yield

  6. Queue Hours

Answer: B,D,E

Question No: 29

When Work Orders or Rate Schedules are completed, which four actions does the system perform?

  1. Updates the Item Location File

  2. Updates unaccounted units in the Work Order Master

  3. Writes a record In the Item Ledger File

  4. Updates the Bill of Material

  5. Updates the Production Cost Table

Answer: A,B,D,E

Question No: 30

The Fixed Labor Overhead cost is not being calculated during the product cost roll up

process and this is one of the main requirements from the customer. Select the options that should be reviewed and/or updated in order to include Fixed Labor Overhead in the product cost rollup process.

  1. In Manufacturing Constants, select Include Fixed Labor Overhead In cost, Calculate Fixed on Setup Labor, and Calculate Fixed on Direct Labor.

  2. Simulated Labor Fixed Overhead Work Center Rate.

  3. In Manufacturing Constants, select Include Fixed Labor Overhead in cost, Calculate Var. on Setup Labor, and Calculate Var. on Direct Labor.

  4. Frozen Labor Variable Overhead Work Center Rate.

  5. Manufacturing Routing

Answer: C

100% Dumps4cert Free Download!
Download Free Demo:1z0-565 Demo PDF
100% Dumps4cert Free Guaranteed!
1z0-565 Dumps

Dumps4cert ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

Add a Comment

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.